Bathroom Remodel Part 1

After working with Mom and Dad on the rental house remodel, we decided to jump in and finally start our bathroom remodel.

Removing the inside storm window.IMG_5835

All the glass is out.
IMG_5836

Upon removing the main window, we discovered the flange that was holding the window in.  There was also a 2 inch gap between the house wall and the brick wall.
IMG_5840

We cut the frame in a couple of spots, and then just had to pry it out.  It ripped up the wall a little, but there wasn’t any way around it.
IMG_5844

Getting ready to install the new windowIMG_3154

Kevin came over to help us.  Because of the 2 inch gap between the brick wall and the interior wall, we had to frame in some pieces of wood to give the window something to screw to.
IMG_5845

It’s in!
IMG_5846

Wall paper is coming down.
IMG_5847

Toilet is out.  Just have the last little bit off wallpaper to get off.
IMG_5848

The mirror and light are off.
IMG_5849

The carpet coming out.  We found old linoleum underneath.
IMG_5854

 

More to come as it comes.  We can’t wait to give this bathroom its big makeover.

Leave a Reply